Home         Links         News         Survey         Contact Us        

     
 

 


About Hydrogen
Village


 
Projects


 
Members

            

Bell Canada Switching Station

Bell Canada is utilizing an 8 kW Hydrogenics/Emerson backup power system for a switching station in Burlington, Ontario. The backup power system is zero emission and offers a much longer period of power delivery than a conventional battery system.

Application: Backup power for telecommunications switching station
 
Technology: DC Power
Outdoor UPS/BPS
8 kW PEM fuel cell/Battery hybrid
 
Location: Bell facility
Burlington, Ontario
 
Contributors:

Bell Canada

Emerson Network Power

Hydrogen Early Adopters Program (h2EA) - Technology Partnerships Canada

Hydrogenics

 

Status: Opened February 16, 2006


 

back to Projects 

© 2006 Hydrogen Village. All rights reserved.